Overview

Bilton Solar is a ground mounted 2.0 MW (ac) solar project located in Somers, CT. The project started construction in 2024 and is expected to achieve commercial operation by the summer of 2025.

Details

Location:

Somers, CT

Project Size:

2.00 AC / 2.82 DC

Status:

Upcoming

Commercial Operations Date:

Summer 2025

Expected Annual Energy Generated:

3,710 MWh

Number of Homes Powered Annually:

370

Installation

Installation Type:

Ground Mount

Number of Solar Modules:

4,550

Module Size:

620W

System Voltage:

21kv

Number of Inverters:

15